MolyCop Chile S.A. (Mejillones Plant)

2013 – 2018
Comprehensive development of industrial projects, including the construction and maintenance of a 60 Ton/h rotary kiln, technological upgrade of the 400 GPM desalination plant, and the implementation of an advanced cooling and refrigeration system, encompassing civil, structural, electrical, and specialized engineering disciplines.
  • Comprehensive Contract – Rotary Kiln and Plant Expansion
    2013 – 2018

    • Large-scale project: TECIC played a key role in the construction, commissioning, and maintenance of a 60-ton/hour rotary kiln, efficiently addressing diverse disciplines such as civil, structural, electrical, and specialized engineering.
  • 400 GPM Desalination Plant Upgrade
    2017 – 2018

    • Technological and critical infrastructure optimization: implementation of substantial improvements in electrical and structural systems, including advanced automation control and a modern electrical room that significantly enhanced operational efficiency.
  • Cooling and Refrigeration System
    2014

    • Specialized engineering: comprehensive development and construction of an advanced cooling system, contributing to a significant increase in the rotary kiln’s performance and the overall quality of the production process.

Respaldados por más de
10 años de experiencia
en el Sector Minero.

Participamos en Gremios
de la Minería para Potenciar
el Desarrollo Sostenible.

Mejoramos la Eficiencia y
Gestión de Recursos con
Metodología PMI.

Respuestas Inmediatas y
Eficientes gracias a
nuestra Ubicación Local.